Skip to main content

Operating regulations for mud pumps



1. The pump must be installed on a stable foundation frame or foundation and should not be loose.
2. All connecting parts should be tightened; The direction of rotation should be correct.
3. The pipeline connection is firm, the seal is reliable, and the bottom valve is flexible and effective. Before starting, the suction pipe, bottom valve, and pump body must be filled with water, and the upper end of the pressure gauge buffer must be filled with oil.
4. Rotate by hand to make the piston reciprocating twice without obstruction and with good insulation of the circuit before starting with no load. After starting, gradually increase the load when the operation is normal.
5. During operation, attention should be paid to the sealing condition of each sealing device, and adjustments should be made if necessary. The pull rod and auxiliary rod should be regularly lubricated with oil.
6. During operation, the mud sand content should not exceed 10% during regular testing.
7. In order to ensure reliable splashing lubrication, the Mud Pump with several speeds should be operated separately in each shift for no less than 30 seconds.
8. It is strictly prohibited to change gears during operation. When changing gears, the pump should be stopped to shift gears.
When there is abnormal noise, heavy water, abnormal pressure, or obvious high temperature during operation, the pump should be stopped for inspection.
10. Fill in daily operation records and oil filling and changing records as required

Comments

Popular posts from this blog

What are the differences bewteen core drilling bits and pdc drilling bits

  Although both core drills and PDC drills are tools used for drilling and sampling, there are significant differences between them in terms of material, structure, and scope of application. Core Drill Definition: A core drill is a broad concept that refers to all drills used for coring operations. It can be a variety of types such as tungsten carbide bits, PDC bits, diamond bits and so on. Function: Mainly used to remove a cylindrical section of core sample from different types of materials for subsequent analysis and research. Material: Various materials, including carbide, diamond, PDC, etc. Different materials are selected according to the hardness and toughness of the drilling material. Structure: Relatively simple structure, mainly consists of drill body, inner cylinder and outer cylinder. Application:  Wide range of applications, including geological exploration, engineering survey, mineral exploration, etc. PDC Drill Bit Definition: PDC drill bit is a special coring dr...

Does the water well drilling bit have a warranty

  Whether or not a water well drill bit has a warranty, and the length of that warranty, depends on several factors: Drill Bit Type:  Different types of drill bits vary greatly in their structure, material and manufacturing process, and therefore warranty policies will vary. For example, PDC bits (polycrystalline diamond composite bits) usually have a longer warranty due to their higher technology, whereas some simple tooth wheel bits or diamond bits may not have a defined warranty or may have a shorter warranty. Manufacturer/Supplier:  After-sales service policies and reputations vary between manufacturers or suppliers. Some large, reputable manufacturers usually offer a good warranty, while some small, unknown suppliers may not offer a warranty or may have harsh warranty terms. Purchase Contracts/Agreements:  When purchasing a drill bit, it is important to read the terms of the purchase contract or agreement carefully, especially the sections on warranty and after-...

How to replace the impeller of a slurry pump

  The impeller of the slurry pump is a wearing part, which needs to be inspected and replaced periodically. The process of replacing the impeller is relatively complex and requires certain specialized knowledge and skills. The following are the steps for replacing the impeller of the slurry pump: 1. Preparation Shut down and disconnect the power:  Before any operation, be sure to cut off the power supply to ensure safety. Preparation tools:  ready wrenches, screwdrivers, gaskets, new impeller and so on. Drain:  Empty the pump. Protective measures:  Wear protective gloves, safety glasses and other protective equipment. 2. Disassembly Procedure DISASSEMBLY:  Disassemble the suction and discharge pipes connected to the pump. Remove pump cover:  Loosen the bolts securing the pump cover and carefully remove the cover. Remove the impeller:  Loosen the nuts secure the impeller with a suitable tool and remove the impeller. 3. Install the new impeller Insp...